Please login first
Tarcisio Abreu Saurin  - - - 
Top co-authors See all
Robert L. Wears

308 shared publications

University of Florida

Sidney W. A. Dekker

132 shared publications

School of Humanities, Languages and Social Science, Griffith University, Brisbane, Australia

José Luis Duarte Ribeiro

125 shared publications

Universidade Federal do Rio Grande do Sul, Brasil

Carlos Torres Formoso

50 shared publications

Professor, Building Innovation Research Unit, Postgraduate Program in Civil Engineering: Construction and Infrastructure, Universidade Federal do Rio Grande do Sul, Av. Osvaldo Aranha, 99/706, Porto Alegre 90035-190, Brazil

Guilherme Luz Tortorella

48 shared publications

Universidade Federal de Santa Catarina, Brasil

86
Publications
0
Reads
0
Downloads
132
Citations
Publication Record
Distribution of Articles published per year 
(2000 - 2018)
Total number of journals
published in
 
27
 
Publications See all
Article 0 Reads 0 Citations Modelo de relações entre os riscos que afetam a implantação de produção enxuta Giuliano Almeida Marodin, Tarcisio Abreu Saurin, Guilherme L... Published: 01 December 2018
Gestão & Produção, doi: 10.1590/0104-530x1214-18
DOI See at publisher website ABS Show/hide abstract
Resumo O baixo índice de sucesso e as mudanças estruturais e organizacionais necessárias para a Implantação da Produção Enxuta (IPE) indicam a necessidade do uso da abordagem de Gestão de Riscos (GR) para gerenciar esta transformação. Este artigo tem como objetivo apresentar um modelo gráfico para explicitar as relações entre os riscos na IPE por meio da utilização da Interpretative Structural Modelling em uma empresa e entender os motivos destas relações. O estudo está baseado em um caso conduzido na unidade de uma empresa global fabricante de componentes hidráulicos. A coleta de dados foi realizada por meio de múltiplas fontes de evidência, como entrevistas, observações, visitas à fábrica e análise de documentos. O modelo desenvolvido propiciou o esclarecimento e entendimento dos efeitos diretos e indiretos da presença dos riscos na IPE na empresa. As principais relações identificadas no modelo foram confirmadas por meio das explicações dos motivos pelos quais tais relações ocorriam no caso.
BOOK-CHAPTER 0 Reads 0 Citations Where process improvement meets resilience Tarcisio Abreu Saurin, Caroline Brum Rosso, Ghignatti Da Cos... Published: 09 October 2018
Delivering Resilient Health Care, doi: 10.4324/9780429469695-14
DOI See at publisher website
Article 0 Reads 0 Citations The joint use of resilience engineering and lean production for work system design: A study in healthcare Caroline Brum Rosso, Tarcisio Abreu Saurin Published: 01 September 2018
Applied Ergonomics, doi: 10.1016/j.apergo.2018.04.004
DOI See at publisher website
BOOK-CHAPTER 0 Reads 0 Citations The Functional Resonance Analysis Method as a Debriefing Tool in Scenario-Based-Training Priscila Wachs, Angela Weber Righi, Tarcísio Abreu Saurin Published: 05 August 2018
Advances in Intelligent Systems and Computing, doi: 10.1007/978-3-319-96089-0_14
DOI See at publisher website
Article 0 Reads 0 Citations Analysis of the preparation and administration of medications in the hospital context based on Lean thinking Diovane Ghignatti Da Costa, Simone Silveira Pasin, Ana Maria... Published: 26 July 2018
Escola Anna Nery, doi: 10.1590/2177-9465-ean-2017-0402
DOI See at publisher website ABS Show/hide abstract
Objectives: To analyze the current way medications are prepared and administered in the hospital setting and to apply a method to establish priorities for problems detected. Method: This is an exploratory-descriptive case study. The data were collected through observation and focus groups with 13 participants who were part of a health team in a surgical inpatient unit of a public university hospital. The analysis was based on a lean production framework. Results: A value stream map was constructed of the current way drugs are prepared and administered, identifying the clients in the process and their requirements. Forty-five current problems were identified, based on requirements that were not met with eight being prioritized to improve planning. Conclusion: Having prioritized the problems, the planning and implementation of continuous improvements in the medication process were started in order to reduce errors and improve the quality of services.
PROCEEDINGS-ARTICLE 0 Reads 0 Citations The Role of Slack in Standardized Work in Construction: An Exploratory Study Marcus C.T. Fireman, Tarcísio A. Saurin, Carlos T. Formoso Published: 18 July 2018
26th Annual Conference of the International Group for Lean Construction, doi: 10.24928/2018/0213
DOI See at publisher website
Top