EventsThe 6th International Electronic Conference on Applied Sciences
Published
This submission belongs to the session S4. Electrical, Electronics and Communications Engineering of the event The 6th International Electronic Conference on Applied Sciences
Published date
03 Dec, 2025
Academic Editor
author-avatarAlessandro Lo Schiavo
Citation
Fábio Monte Braz, Angilberto Muniz Ferreira Sobrinho, Fábio de Souza Cardoso, Testing and validation procedure of Communication between an Industrial Robot Controller and a PLC via SLMP IoT Protocol, in Proceedings of The 6th International Electronic Conference on Applied Sciences, 9 December–11 December 2025, MDPI: Basel, Switzerland
Share
Email
Facebook
Twitter
LinkedIn

Testing and validation procedure of Communication between an Industrial Robot Controller and a PLC via SLMP IoT Protocol

1. Universidade do Estado do Amazonas and Manaus, Manaus 69020-120, Brazil, Brazil
Abstract

Introduction: One of the main challenges of Industry 4.0 is ensuring effective communication between different automation systems, such as industrial robots and Programmable Logic Controllers (PLCs). This work presents a validation test procedure for communication between an industrial robot controller and a PLC using a Seamless Message Protocol (SLMP) IoT protocol, addressing the critical need for seamless integration in modern manufacturing environments.

Methods: The proposed solution uses TCP/IP sockets in conjunction with the SLMP protocol, developed by the CC-Link Partner Association, which enables communication between industrial devices using conventional Ethernet networks. The implementation was carried out in the RAPID language, specifically designed for industrial robot programming. Systematic validation tests were conducted to evaluate communication performance, measuring success rate, average response time, and potential communication errors across multiple test cycles.

Results: The experimental validation demonstrated exceptional performance with a 100% success rate and an average response time of 11.3 ms over 100 consecutive test cycles. No communication errors were detected during the entire testing period, indicating robust and reliable data exchange between the robot controller and PLC.

Conclusions: The results confirm the viability and efficiency of the proposed SLMP-based solution for applications in industrial environments that require integration of different automation equipment, providing a reliable foundation for Industry 4.0 implementations

Keywords
Industrial Communication Protocol
Programmable Logic Controller (PLC)
Robot Controller Integration
Seamless Message Protocol (SLMP)
Poster
Testing and validation procedure of Communication between an Industrial Robot Controller and a PLC via SLMP IoT Protocol.pptx (1).pdf
Reconfigurable Metasurface-Enabled AIoT Framework for Intelligent and Sustainable Smart Cities
Real-Time Monitoring of Induction Motor Parameters Using ESP32 and MQTT Protocol