EventsThe 1st International Online Conference on Technologies
Published
This submission belongs to the session S4. Manufacturing Technologies of the event The 1st International Online Conference on Technologies
Published date
06 Nov, 2026
Academic Editor
author-avatarEugene Wong
Contribution&Funding
Conceptualization,
[Ali Tahmasebi]
Methodology,
[Ali Tahmasebi]
Software,
[Ali Tahmasebi]
Validation,
[Ali Tahmasebi]
Formal analysis,
[Ali Tahmasebi]
Investigation,
[Ali Tahmasebi]
Resources,
[Ali Tahmasebi]
Data curation,
[Ali Tahmasebi]
Writing - original draft,
[Ali Tahmasebi]
Writing - review,
[editing] ; [Ali Tahmasebi]
Visualization,
[Ali Tahmasebi]
Supervision,
[Ali Tahmasebi]
Project administration,
[Ali Tahmasebi]
Funding acquisition,
[Ali Tahmasebi]
Funding: --
Citation
Ali Tahmasebi, Early Enough to Act? Event Level Evaluation of Predictive Maintenance Alarms Using the MetroPT-3 Dataset, in Proceedings of The 1st International Online Conference on Technologies, 11 November–13 November 2026, MDPI: Basel, Switzerland
Share
Email
Facebook
Twitter
LinkedIn

Early Enough to Act? Event Level Evaluation of Predictive Maintenance Alarms Using the MetroPT-3 Dataset

1. Thomas J. Watson College of Engineering and Applied Science, The State University of New York at Binghamton, New York, USA
Abstract

Introduction: Predictive-maintenance studies frequently report pointwise anomaly-detection metrics that do not reveal whether alarms occur early enough for intervention or whether false alerts are operationally acceptable. This study develops an intervention-centered benchmarking framework and applies it to the publicly available MetroPT-3 compressed-air-system dataset.

Methods: Sensor observations were aggregated into one-minute statistical features. A strictly time-ordered design used February 2020 for model training, 1 March–16 April for threshold calibration, and 17 April–1 September for evaluation. Robust median absolute-deviation scoring, principal-component reconstruction error, isolation forest, and a compact multilayer autoencoder were evaluated under the same three calibration-threshold quantiles and three alarm-persistence rules. Performance measures included pointwise precision, recall, and F1 score; event-level detection of four reported failures; 24-hour early-warning recall; signed warning lead time; false-alarm events per 30 days; and cost-sensitive indices.

Results: The cost-selected isolation-forest configuration, using a 99th-percentile threshold and a six-of-ten-minute persistence rule, detected all four failure events and achieved a pointwise F1 score of 0.708 while generating 1.31 false-alarm events per 30 evaluation days. However, only one failure was identified within the preceding 24-hour warning window, with an eight-minute lead time. A more permissive isolation-forest configuration increased early-warning recall to 75% but produced 4.81 false alarms per 30 days. The multilayer autoencoder did not improve the operating frontier: with thresholds calibrated identically to the other methods, it produced no evaluation-period alarms and detected none of the four reported failures.

Conclusions: Neither strong pointwise performance nor greater model complexity necessarily provides actionable maintenance warning. Alarm timing, persistence, false-alarm burden, and intervention costs should therefore be evaluated alongside conventional accuracy metrics when benchmarking predictive-maintenance systems.

Keywords
Predictive maintenance
anomaly detection
MetroPT-3
event-based evaluation
isolation forest
Optimization of laser ablation for silver and nickel removal from piezoceramic discs in bimorph deformable mirror fabrication
A repeatable manual polishing technique for correcting endface geometry in fc/pc fiber optic connectors