Mehedi Ahmed Ansary, DEVELOPMENT OF THE MRT LINE-6 DEPOT IN DHAKA, BANGLADESH, in Proceedings of OHOW 2026 – The 5th International Symposium on One Health, One World, Hanoi, 26 November–28 November 2026, MDPI: Basel, Switzerland
Share
Email
Facebook
Twitter
LinkedIn

DEVELOPMENT OF THE MRT LINE-6 DEPOT IN DHAKA, BANGLADESH

1. Civil Engineering, BUET, Dhaka, 1000, Bangladesh
Abstract

A hybrid system of Sand Compaction Piles and Prefabricated Vertical Drains was used to enhance the ground performance of a MRT Line-6 depot site in Dhaka, Bangladesh. PVDs were positioned up to a depth of around 21 m with 1.5 m triangular spacing to accelerate the consolidation of soft clay layers, while 700 mm diameter SCPs were constructed to boost liquefaction resistance up to a depth of around 5 m with 1.5 m square spacing and also up to a depth of around 24 m with 2.12 m square spacing to strengthen the very soft to medium stiff clay layers. The preload height of the embankment ranged from 3-4 m. Asaoka and Hyperbolic observational approaches were employed to estimate the final settlement. The expected eventual settlements in the PVD-treated zone and the SCP-treated zone were approximately 666 mm and 378 mm, respectively. A peak ground acceleration of 0.31 g and an earthquake magnitude of 7.5 were used to calculate the liquefaction potential. Prior to the ground improvement, factors of safety against liquefaction ranged from 0.2 to 0.5, indicating high susceptibility; however, post-treatment conditions showed a significant improvement with factors of safety above 1.0. Three-dimensional finite element analysis was utilized to predict the consolidation behavior and staged embankment construction. Numerical predictions and field observations corresponded reasonably well, with settlement variations of about 2-4% and disparities between numerical and expected ultimate settlements of about 13-14%. The improved ground showed effective load sharing with stress concentration ratios between 3.6 and 4.6.

Keywords
Ground improvement
Prefabricated vertical drains (PVD)
Sand Compaction Pile (SCP)
Stress Concentration Ratio
Liquefaction Mitigation
SAR Satellite Analysis Using ALOS-4 Data For Ground Subsidence Monitoring
An Integrated IoT and Remote-Sensing based MRV Framework for Carbon Crediting of AWD-Irrigated Boro Rice in Bangladesh