In order to meet the goal of reaching Net Zero Emissions by the year 2060, there is a global demand for the energy transition in the port sector. The installation of Onshore Power Supply is one of the specific endeavors that PT Pelabuhan Indonesia (Persero) has been trying to accomplish. The purpose of this study is to investigate the installation of OPS use in Pelindo ports, as well as the benefits and optimization measures associated with it.
The methodology used is descriptive-qualitative and incorporates three approaches: a literature review focusing on secondary data from Pelindo presentations, 2023 IMO regulations, IEC/ISO/IEEE 80005-1 standards, and Green Port policies; case analysis evaluating OPS execution at four Pelindo ports (Tanjung Priok, Tanjung Perak, Belawan, and Makassar); and data examination conducting a descriptive analysis of emissions, expenses, and OPS usage to assess opportunities for emission reduction and cost efficiencies. OPS has the potential to cut emissions of carbon dioxide, nitrogen oxides, and sulfur oxides by up to 85-95% while ships are anchored at a berth. One container ship has the potential to reduce around 3.8 tons of carbon dioxide emissions in a span of twenty-four hours. Compared to the use of auxiliary engines, the utilization of OPS results in a forty to fifty percent reduction in ship operational costs. On the other hand, there are still limitations to operational efficiency improvement, such as technical standards, electricity costs, laws, and low ship compatibility. The implementation of No Emission at Berth legislation, special tariffs, incentives, and outreach to shipping businesses are all tactics that are recommended since they accelerate the process. To summarize, OPS is an essential option for Pelindo to achieve its goal of accelerating the decarbonization of ports in Indonesia.