Previous Article in event
            
                            Previous Article in session
            
                    
    
                    Next Article in event
            
                            Next Article in session
            
                    
                                                    
        
                    Intervention time of porous asphalt mixture evaluation to prevent clogging
                
                                    
                
                
                    Published:
14 March 2023
by MDPI
in The 7th International Electronic Conference on Water Sciences
session Integrated Water Resources Management
                
                                    
                
                
                    Abstract: 
                                    Porous pavements are considered an alternative to increasing the city's permeable surfaces with great potential for rainwater harvesting. Over time, the surface layer clogs, limiting porous pavement dissemination. This study aims to evaluate the maximum time for an intervention of a porous surface to recover its permeable properties before clogging. Through a constant load permeameter, rainwater runoff simulations were performed to measure the permeability coefficient of porous asphalt mixtures. Void content and void communication were also evaluated. The results show that the intervention by surface cleaning for the porous asphalt mixtures studied should occur every year.
                        Keywords: porous asphalt mixtures; clogging; intervention time
                    
                
                
                
                
            